Tired of council delays holding up your build? We fix that

We Streamline Your CDC Approval To Get You On-Site Faster

We specialise in managing CDC submissions to bypass council queues, turning roadblocks into your stamped, construction-ready plans.

TRUSTED BY:

Item 1
Item 2
Item 3
Item 4
Item 1
Item 2
Item 2
Item 2
Item 2
Item 2

The Tangible Results of Our CDC Process

Our managed CDC process is engineered to deliver speed and certainty, allowing you to move forward with confidence.

4–6 Weeks

Average Approval Turnaround

3-9+ Months

Of Council Delays Avoided

0 Hours

You'll Spend On Paperwork

The Problem

Understanding The Traditional DA Trap

The traditional Development Application (DA) route requires submitting plans to your local council. This process is known for bottlenecks due to subjective assessments and significant backlogs, leading to costly delays.

The Traditional DA Trap

Stop Paying Holding Costs And Waiting For Council

Your project deserves momentum, not months of delays. The traditional council DA route is filled with bottlenecks that drain your capital and excitement. These are the frustrations we help you avoid entirely.

The Endless Waiting Game

It’s beyond frustrating to watch your project sit idle for months. Budgets shrink and momentum dies while you wait for a simple stamp of approval.

Crippling Holding Costs

Every month you're stuck waiting is another month you're paying interest on land you can't even touch. We get the financial pressure this creates.

Overwhelming Complexity

Navigating confusing state guidelines shouldn't be your full-time job. You’re not a town planner, and you shouldn’t have to become one.

Our Solution

A Process Built for the CDC System

The Complying Development Certificate (CDC) is a state-governed, code-based approval pathway. Unlike a DA, it is not a subjective assessment. It is a factual, “”tick-box”” process where plans are approved by an independent private certifier if they meet a strict set of statewide codes.

This system demands absolute precision. There is no room for error. Our entire service is engineered for this reality. We don’t just create designs; we produce highly compliant technical documentation that is purpose-built to meet the black-and-white requirements of the CDC, ensuring a fast, predictable outcome.

Our 4-Step Process

The CDC Approval Pathway

Our methodical process navigates the strict demands of the CDC system, getting your project approved efficiently.

Brief & Feasibility

We confirm your project’s CDC eligibility and provide a fixed-price proposal within 12 hours.

Design & Documentation

We draft all architectural plans and coordinate the required technical reports for a complete package.

Submission & Assessment

We submit your package to a private certifier and manage all correspondence and follow-ups.

Approval & Handover

We hand over your stamped, construction-ready plans, so your builder can start on-site.

For Ambitious Builders

We Help Builders And Developers Who Value Speed

We love working with clients who value speed and certainty. We’re the right fit if you are:

An ambitious homeowner ready to skip the queue.

A savvy developer who demands rapid turnarounds.

A quality-focused builder seeking a reliable partner.

An architectural firm outsourcing documentation.

Your Complete CDC Approval Package

Our service manages every document required by the private certifier for a successful and fast approval.

Design & Technical Plans

We draft the complete architectural and engineering plans required for your project’s approval.

Compliance Documentation

We prepare all required reports for a complete and compliant submission package.

Submission & Management

We manage the entire submission process with the private certifier on your behalf.

What You Can Expect

Our Average Approval Time Is 4-6 Weeks

We manage all the paperwork and follow-ups, so you can stop chasing planners and focus on the actual build.

The Risks We Eliminate

Common CDC Roadblocks We Solve

A single technical mistake can cause major delays. We are meticulous to ensure approval.

Boundary Line Rejections

We use precise site planning to get boundary setbacks right the first time.

Incorrect Floor Space Calculations

We use 3D modelling to verify Gross Floor Area (GFA) compliance before submission.

Missing Energy Reports

We generate all required BASIX and NatHERS reports from the very start.

Height & Overshadowing Violations

We conduct rigorous code audits to ensure your design is fully compliant.

Mismatched Engineering Plans

We coordinate with engineers to ensure all plans are perfectly integrated.

See How Our CDC Process Beats The Old DA Route

There are two ways to get building approval in Sydney. One is slow and unpredictable. The other is our way. The difference is night and day.

Our Managed Service

The Traditional DA Path

See Our Work With Sydney Builders & Developers

Real results and honest feedback from people we work with every day.

Our Promise

We Design Plans That Actually Get Built

We believe great design is worthless if it’s stuck on paper. We turn your ambitious vision into a buildable reality that respects your budget and timeline.

Guidance Through Complex Regulations

Our team guides you through the process, protecting you from bureaucratic stress and costly errors.

Louie Obeid

Owner

Designs That Respect Your Build Budget

Beautiful concepts mean nothing if they break the bank. We engineer designs to align with your construction budget.

CDC-Focused Workflow To Save Months

We align our entire process with CDC guidelines to avoid lengthy delays and get you the green light to build sooner.

Meticulous Planning For Full Compliance

Whether dealing with tricky boundaries or heritage rules, our detailed planning ensures total regulatory compliance.

Your Top CDC Approval Questions Answered

What Is A Complying Development Certificate?

A Complying Development Certificate (CDC) is a fast-track approval for projects that meet a specific set of statewide codes. It means a private certifier can approve your plans directly, letting you skip the long DA process with your local council and saving you months of waiting.

It depends on your local zoning and site conditions. Duplexes, new homes, and major renovations are often perfect candidates. However, issues like flood zones can add complexity. We always conduct an upfront feasibility check to ensure the CDC path is right for you.

A private certifier is an independent expert authorised to approve projects against the state’s codes. Unlike a council planner with a huge backlog, a certifier’s only job is to assess compliance. This makes the process much faster and more predictable.

It happens. If you need to make changes after your certificate is issued, we’ve got you. It usually requires a simple modification application, which we’ll prepare and submit to keep your project moving.

Every block of land is different, so the cost depends on the specific technical documents your project needs. We’ll give you a crystal-clear, fixed-price proposal within 12 hours that covers everything including engineering, energy reports, and certifier fees. No surprises.

Explore Our Other Services

Bespoke Custom Home Design

Duplex & Dual Occupancy Drafting

Functional Granny Flat Layouts

Start Your Project With Clarity

Talk To The Team Behind Your Approval

Get direct access to experts who understand council approvals, timelines, and real-world constraints. Visit us or contact us to move forward with confidence.

Address

Main office

49th Floor, 8 Parramatta Square, 10 Darcy Street, Parramatta, NSW 2150, Australia

Work Schedule

Mon - Fri:

8:00 am — 5:00 pm

Sat:

8:00 am — 12:00 pm

Sun:

Closed

Your Next Step

Ready To Get Approved Without The Council Headaches

Let us handle the entire process for you. Contact our Parramatta studio and we’ll send you a fixed-price quote and timeline within 12 business hours.